PostPosted: Fri Mar 06, 2015 8:03 pm 

Joined: Sun Aug 22, 2004 7:19 am
Posts: 6464
Location: southeastern USA
Absolutely. I once read a reprint of a book written by Oliver Evans in about 1820 or thereabouts, in which he describes the need to allow the boiler to "breathe" as it expands and contracts in service.

dave

_________________
“God, the beautiful racket of it all: the sighing and hissing, the rattle and clack of the cars over the rails. These were the sounds that made America the greatest country on earth." Jonathan Evison


Offline
 Profile  
 
 Post subject: Re: New boilers (a few cautionary tales...)
PostPosted: Fri Mar 06, 2015 9:20 pm 

Joined: Sat Feb 05, 2005 1:05 am
Posts: 488
Dave wrote:
... the need to allow the boiler to "breathe" as it expands and contracts in service.


Not to be confused with the German balloon boilers that have no thermal expansion anchoring points.


Offline
 Profile  
 
 Post subject: Re: New boilers (a few cautionary tales...)
PostPosted: Sat Mar 07, 2015 11:50 am 

Joined: Sun Oct 19, 2008 12:58 pm
Posts: 1352
Location: Chicago USA
It's unfortunate that so many have turned out bad and so much difficult-to-raise money was wasted. One would think that that would be a freakishly rare thing. Is it really that difficult to copy what was done before and even if making changes to conform to newer safety codes or going from riveted to all-welded, conforming to the dimensions of the old boiler would seem like a "duh" item.


Offline
 Profile  
 
 Post subject: Re: New boilers (a few cautionary tales...)
PostPosted: Sat Mar 07, 2015 12:21 pm 

Joined: Fri Jul 23, 2010 12:41 pm
Posts: 540
Location: Minneapolis, MN
filmteknik wrote:
It's unfortunate that so many have turned out bad and so much difficult-to-raise money was wasted. One would think that that would be a freakishly rare thing. Is it really that difficult to copy what was done before and even if making changes to conform to newer safety codes or going from riveted to all-welded, conforming to the dimensions of the old boiler would seem like a "duh" item.


When you think about it a little, there are problems with dimensions. A cylindrical riveted boiler has a diameter change at each course so that one course will fit INSIDE the last, and the courses are typically cylindrical. A welded boiler has no laps at the courses. So a 3 course welded boiler using 3/4 inch plate needs to compensate for a difference in diameter of each course of 1-1/2 inches, or 5-1/2 inches from first course to last. To compensate for the diameter changes at the course seams, the welded courses must have a slight conical section. Now try to fit that onto the frame that was designed for the riveted boiler. Not so easy. It requires lots of fudging, and that changes the design and all of the stress calculations. Back in the steam era, the RRs had no trouble with this because they had engineers that did this kind of thing every day. Just another skill that, while not exactly lost, is pretty scarce today.


Offline
 Profile  
 
 Post subject: Re: New boilers (a few cautionary tales...)
PostPosted: Sat Mar 07, 2015 12:49 pm 

Joined: Mon Aug 23, 2004 3:01 pm
Posts: 1755
Location: SouthEast Pennsylvania
Is it possible to lap the telescoping courses of a cylindrical welded boiler so that it has the same dimensions as a boiler that is riveted and lapped at the courses? Or, does this introduce other safety problems? (I don't mean a boiler that is riveted and lapped at its seams.)


Offline
 Profile  
 
 Post subject: Re: New boilers (a few cautionary tales...)
PostPosted: Sun Mar 08, 2015 9:59 am 

Joined: Sun Oct 19, 2008 12:58 pm
Posts: 1352
Location: Chicago USA
Surprised that the riveted boiler must get progressively larger when they could just do the courses as bigger / smaller / bigger/ smaller. Is that simply a custom or is there a specific reason?


Offline
 Profile  
 
 Post subject: Re: New boilers (a few cautionary tales...)
PostPosted: Sun Mar 08, 2015 7:25 pm 

Joined: Thu Apr 14, 2005 9:34 pm
Posts: 2836
Location: Copenhagen, Denmark
There are stationary boilers with alternating course diameters.

In a locomotive boiler, a larger size at the firebox end is a good thing, so why not lap the courses in increasing diameter?

http://upload.wikimedia.org/wikipedia/commons/6/6d/Dampfkessel_f%C3%BCr_eine_Station%C3%A4rdampfmaschine_im_Textilmuseum_Bocholt.jpg

_________________
Steven Harrod
Lektor
Danmarks Tekniske Universitet


Offline
 Profile  
 
 Post subject: Re: New boilers (a few cautionary tales...)
PostPosted: Wed Mar 11, 2015 7:18 pm 

Joined: Tue May 21, 2013 3:20 pm
Posts: 89
Location: Vancouver Island
J. David, and contributors, thanks for this thread, and the very interesting one on 1385. One recent boiler which may not be well known in the US is that on Prairie Dog Central #3 in Winnipeg, Canada. This is an 1882 Dubs (Glasgow) built 4-4-0, Ex CPR, Ex City of Winnipeg Hydro Rwy. I include a link to an article in Canadian Rail magazine describing the re boilering of the engine between 2002 and 2009, to replace it's 1910 CPR built boiler. The article does not get very technical but it was built by Saskatoon Boiler works to the ASME code, as such the stays have full penetration welds and from the photo's appear to have a greater than 4" pitch. The run is about 15 miles each way on level terrain at about 25mph pulling 5-6 wood coaches, as far as I am aware the boiler steams and has been performing well. A friend was involved in the design of this boiler so I will ask him for more information when I get the chance.

http://www.exporail.org/can_rail/Canadian%20Rail_no531_2009.pdf

Out of curiosity, what changes were required to the 1980's Chinese SY boilers to make them ASME compliant, apologies if this has been discussed before.
P. Hosford


Offline
 Profile  
 
 Post subject: Re: New boilers (a few cautionary tales...)
PostPosted: Thu Mar 12, 2015 9:00 pm 

Joined: Mon Aug 23, 2004 2:14 pm
Posts: 618
Location: Essex, Connecticut, USA
Dear P.Hosford:
At the time Valley Railroad SY1647M was purchased, we were under the jurisdiction of the State of Connecticut. With the assistance of Hartford Steam Boiler and various State officials, we got an act of the legislature passed allowing for the boiler to be operated in the state if it were to be EQUIVALENT to an ASME boiler. We retained the services of Joe Micheal, M.E. (Catskill Mountain Railroad) to do an engineering analysis (reverse engineer) the standard SY boiler verses ASME Section 1 and 49CFR Part 230 and identify items which were at variance.
The major areas were: the use of fillet welds rather than full penetration welds on staybolts and such and that the entire boiler wasn't stress relieved. Also the stress on the crownstays was slightly over the FRA maximum.
After over a year of negotiations and planning, Valley and Tangshan agreed on modifications to the standard SY boiler including full penetration welds and larger diameter crownstays. Tangshan insisted on a thicker firebox (1/2") as their welding engineers were concerned about controlling warping with thinner sheets (3/8") with full penetration. They imported the steel for the firebox from France. Joe wrote a paper which argued for the non-necessity of stress relieving the boiler (made of 5/8" material).
We hired Hartford Steam Boiler to provide an AI (Authorized Inspector), (Larry Loke, a Mandarin speaker from their Singapore office) who made on site inspections prior to construction to check Tangshan's material tracking and certification, welding procedures and welder qualification as well as quality control and inspection; during fabrication and fit up and again for the hydro test when the boiler was finished.
SY1658M (now VRR 3025) was constructed a couple of months later using our modifications. A third modified SY, 1698M, was constructed the following year, but it was lost when the ship carrying it ("Braut Team") sank in the Indian Ocean.
J.David
PS: The "M" stands for "Meiguo", (Beautiful Land); America in Chinese. JDC


Offline
 Profile  
 
 Post subject: Re: New boilers (a few cautionary tales...)
PostPosted: Fri Mar 13, 2015 12:24 am 

Joined: Tue May 21, 2013 3:20 pm
Posts: 89
Location: Vancouver Island
Thanks again J. David, a fascinating story! Also relevant to this discussion is an interesting little paperback book I recently picked up on holiday in the UK, called "Locomotive Boilers for the twenty first century" by Alan J. High (C. Eng, M.I. Mech. E). While the book is entirely from a UK perspective, its probably a worthwhile read for anyone contemplating going the new boiler route. With the caveat that some of his ideas may not meet every jurisdictions codes. It contains a lot of interesting and useful information, including a description of the some of welded joints used in the all welded boiler for Bullieds Leader in 1948. The author breaks down new boilers into four options ranging from traditional techniques to a radical redesign including the use of water wall construction for fireboxes. He maintains that while water wall fireboxes were not successful in the past that was only because of the construction techniques available at the time. It would certainly be sticking your neck way out to try it though! Whether you agree with him or not its and interesting little read.
Pat Hosford


Offline
 Profile  
 
 Post subject: Re: New boilers (a few cautionary tales...)
PostPosted: Mon Mar 23, 2015 12:02 am 

Joined: Sat Feb 05, 2005 1:05 am
Posts: 488
wilkinsd wrote:
Seriously, why would anymore make the inner firebox 1" thick? Is that a standard practice in stationary boilers? Don't thicker sheets require different stay bolt spacing?


I dealt with this phenomenon on a small 24" diameter wet bottom locomotive type boiler to replace an Ames Iron Works boiler vintage 1880. It comes from boiler companies that have only built watertube boilers, trying to apply firetube boiler Code requirements, with which they are totally unfamiliar. In this example, the backhead and throat sheet plates were 1-1/4" thick. (Thicker is always better, Right?) The throat sheet was calculated first as an unstayed flat head, good for 125 PSI. They added staybolts calculated out as good for 50 PSI, so 125 + 50 = 175, so the boiler was certified for 150 MAWP and Code stamped accordingly. In cases like this, the ASME gives a simple directive, "Bring the boiler into Code compliance or remove the Code symbol Stamp." Very expensive modifications were made to bring the boiler into Code compliance.

Unfortunately, the old boiler had been shipped off to the manufacturer, who scrapped it after the new boiler shipped. Today the museum has a full size photo of the original boiler next to the Frankenstein boiler that is not used.


Very expensive modifications were made to bring the boiler into Code compliance.
As an aside note: There are 4 power plant boilers in Hawaii that had to have "R" stamp work executed before they saw their first match. The ASME Code is complicated, even for big companies that do this work every day. Just because your company has a Code Stamp, the ASME expects that you will stay away from that which you do not understand.


Offline
 Profile  
 
 Post subject: December 5, 2015
PostPosted: Sun Dec 06, 2015 4:07 am 

Joined: Mon Feb 17, 2014 4:20 pm
Posts: 487
On the topic of firebox steel, below is a 1920 photo and caption of the largest plate of firebox steel made to that date.
Quote:
"May 12, 1920. This picture shows the largest firebox plate ever made to date.

It was one of ten plates of the same size, 250" x 195 1/2" x 3/8", furnished on Phila. 4542. The plates were used to form the crown, sides and combustion chamber of locomotive fireboxes, one plate per locomotive.

The locomotives were built by the Baldwin Locomotive Works for the A. T. & S. F. Railroad and the material was Basic Locomotive Firebox Steel furnished to A. T. & S. F. specification 143-A."

Lukens Steel Company
05-12-1920

Image source: Hagley Digital Archives: "Largest Fire Box Plate Ever Made"


Image

Image


Offline
 Profile  
 
 Post subject: Re: New boilers (a few cautionary tales...)
PostPosted: Sun Dec 06, 2015 12:02 pm 

Joined: Mon May 04, 2015 12:06 pm
Posts: 15
How about the new boiler made for Heisler #6 at Cass. I think it was done in the late 90's? If I recall correctly, Sisterville Tank in West Virginia made it.


Offline
 Profile  
 
 Post subject: Re: New boilers (a few cautionary tales...)
PostPosted: Sun Dec 06, 2015 2:52 pm 

Joined: Thu Mar 15, 2007 12:47 pm
Posts: 171
Location: Arizona
mdogg wrote:
How about the new boiler made for Heisler #6 at Cass. I think it was done in the late 90's? If I recall correctly, Sisterville Tank in West Virginia made it.


The boiler from Cass Heisler #6 seems to be doing well. There were some initial issues (like the domes being mounted crooked), but other than that, it seems to have few issues.

Biggest gripe I have seen is the corner washout plugs were put on the throat and backhead sheets, not in the corners, (even though to was built with flanged corners) making it tougher to get the corners clean on boiler washes.

#6's boiler runs out of flue time (on the 15 year clock) this month. It will be interesting to see how she fares on the new Form 4. She has little actual service days on her, only because the crews at Cass hate the engine and don't like to run it. It only sees service when something else is down for service.


Offline
 Profile  
 
 Post subject: Re: December 5, 2015
PostPosted: Sun Dec 06, 2015 4:39 pm 

Joined: Tue Sep 14, 2004 7:52 am
Posts: 2477
.


Last edited by Kelly Anderson on Fri Nov 29, 2024 5:19 pm, edited 1 time in total.

Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 39 posts ]  Go to page Previous  1, 2, 3  Next

All times are UTC - 5 hours [ DST ]


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to: