New track at Strasburg?
https://rypn.org/forums/viewtopic.php?f=1&t=31322
Page 1 of 2

Author:  Miketherailfan [ Mon May 02, 2011 10:18 pm ]
Post subject:  New track at Strasburg?

Some photos were posted recently of what appear to be new track construction going on at the Strasburg Railroad. Photos can be viewed here: http://Forums.Railfan.net/forums.cgi?bo ... start=1100

Is there anyone at liberty to disclose a bit of information? ;)

Author:  daylight4449 [ Tue May 03, 2011 6:59 am ]
Post subject:  Re: New track at Strasburg?

I'm putting my money down on a loop track. Strasburg does see occasional freight car unloading/storage, so it would make sense that you need an extra spot for those cars.

Author:  Erik Ledbetter [ Tue May 03, 2011 9:49 am ]
Post subject:  Re: New track at Strasburg?

BIDS track for Mr. Weaver's Wonderful Patent Plastic Pellet Transfer Machine?

Author:  S. Weaver [ Tue May 03, 2011 5:12 pm ]
Post subject:  Re: New track at Strasburg?

Erik Ledbetter wrote:
BIDS track for Mr. Weaver's Wonderful Patent Plastic Pellet Transfer Machine?

Hah-hah! Close, Erik, and "Mr. Daylight." It's a new sixteen-spot team track to handle growing traffic, half of which will be paved to rail height in order to preserve SRC parking during our busy times.

Author:  MFolland [ Tue May 03, 2011 11:36 pm ]
Post subject:  Re: New track at Strasburg?

Out of curiousity, if Strasburg is seeing an influx in freight traffic, are employees getting covered under RRR?

Author:  Alexander D. Mitchell IV [ Wed May 04, 2011 7:02 am ]
Post subject:  Re: New track at Strasburg?

MFolland wrote:
Out of curiousity, if Strasburg is seeing an influx in freight traffic, are employees getting covered under RRR?


AFAIK they always have been. Or at least had that option.

Author:  Mr. Ed [ Wed May 04, 2011 10:05 am ]
Post subject:  Re: New track at Strasburg?

Wasn't there talk of installing a turntable at the facility? I was just there on the 22nd standing right where they are working.

Later!
Mr. Ed

Author:  S. Weaver [ Wed May 04, 2011 10:58 am ]
Post subject:  Re: New track at Strasburg?

@ MFolland, always have.

@ Mr Ed, not for a while.

Author:  6-18003 [ Thu May 05, 2011 12:16 am ]
Post subject:  Re: New track at Strasburg?

What's the cost to lay track these days? Figure a passing spur on a main line, big enough to accomodate an engine, tender, and 3-4 coaches?

Author:  daylight4449 [ Thu May 05, 2011 7:03 am ]
Post subject:  Re: New track at Strasburg?

6-18003 wrote:
What's the cost to lay track these days? Figure a passing spur on a main line, big enough to accomodate an engine, tender, and 3-4 coaches?

I think that Strasburg trains run in the area of 7-8 coaches. Might want to double that length, and accomidate for a tender. So about 10 coaches in length.

Author:  S. Weaver [ Thu May 05, 2011 10:13 am ]
Post subject:  Re: New track at Strasburg?

Good ballpark is $165/foot for new sidings. Your mileage may vary ...

Author:  daylight4449 [ Thu May 05, 2011 11:01 am ]
Post subject:  Re: New track at Strasburg?

S. Weaver wrote:
Good ballpark is $165/foot for new sidings. Your mileage may vary ...

So, if i'm doing my math right, that's $1,650 for every ten feet. Man, the depot is going to need to raise some money for a display track...

Author:  Bobharbison [ Thu May 05, 2011 11:33 am ]
Post subject:  Re: New track at Strasburg?

S. Weaver wrote:
Good ballpark is $165/foot for new sidings. Your mileage may vary ...


Keep in mind, that's on a "prepared subgrade", i.e. you have a piece of ground that's to grade and able to support the track. If you need any earthwork, that's in addition to the $165 per foot.

On the other hand, if it's simply a display track, you may be able use second hand (relay) materials, and cut that $165 cost significatly in some cases.

Author:  Mr. Ed [ Thu May 05, 2011 12:41 pm ]
Post subject:  Re: New track at Strasburg?

Thanks S!

Later!
Mr. Ed

Author:  cjvrr [ Thu May 05, 2011 1:54 pm ]
Post subject:  Re: New track at Strasburg?

I just had 21,000+ feet of County owned track rebuilt for $115 per foot. New sidings were $130.00 per foot including excavation. This was in northern NJ. Used No.1 relay 136 lb rail.

New #10 turnouts ran $55,000.00 each, 10 total on the job.

Surfacing and aligning track cost another $5.00 per foot and ballast was $20.00 per ton, installed. Excavation was $30.00 per cubic yard.