| Railway Preservation News https://rypn.org/forums/ |
|
| New track at Strasburg? https://rypn.org/forums/viewtopic.php?f=1&t=31322 |
Page 1 of 2 |
| Author: | Miketherailfan [ Mon May 02, 2011 10:18 pm ] |
| Post subject: | New track at Strasburg? |
Some photos were posted recently of what appear to be new track construction going on at the Strasburg Railroad. Photos can be viewed here: http://Forums.Railfan.net/forums.cgi?bo ... start=1100 Is there anyone at liberty to disclose a bit of information? ;) |
|
| Author: | daylight4449 [ Tue May 03, 2011 6:59 am ] |
| Post subject: | Re: New track at Strasburg? |
I'm putting my money down on a loop track. Strasburg does see occasional freight car unloading/storage, so it would make sense that you need an extra spot for those cars. |
|
| Author: | Erik Ledbetter [ Tue May 03, 2011 9:49 am ] |
| Post subject: | Re: New track at Strasburg? |
BIDS track for Mr. Weaver's Wonderful Patent Plastic Pellet Transfer Machine? |
|
| Author: | S. Weaver [ Tue May 03, 2011 5:12 pm ] |
| Post subject: | Re: New track at Strasburg? |
Erik Ledbetter wrote: BIDS track for Mr. Weaver's Wonderful Patent Plastic Pellet Transfer Machine? Hah-hah! Close, Erik, and "Mr. Daylight." It's a new sixteen-spot team track to handle growing traffic, half of which will be paved to rail height in order to preserve SRC parking during our busy times. |
|
| Author: | MFolland [ Tue May 03, 2011 11:36 pm ] |
| Post subject: | Re: New track at Strasburg? |
Out of curiousity, if Strasburg is seeing an influx in freight traffic, are employees getting covered under RRR? |
|
| Author: | Alexander D. Mitchell IV [ Wed May 04, 2011 7:02 am ] |
| Post subject: | Re: New track at Strasburg? |
MFolland wrote: Out of curiousity, if Strasburg is seeing an influx in freight traffic, are employees getting covered under RRR? AFAIK they always have been. Or at least had that option. |
|
| Author: | Mr. Ed [ Wed May 04, 2011 10:05 am ] |
| Post subject: | Re: New track at Strasburg? |
Wasn't there talk of installing a turntable at the facility? I was just there on the 22nd standing right where they are working. Later! Mr. Ed |
|
| Author: | S. Weaver [ Wed May 04, 2011 10:58 am ] |
| Post subject: | Re: New track at Strasburg? |
@ MFolland, always have. @ Mr Ed, not for a while. |
|
| Author: | 6-18003 [ Thu May 05, 2011 12:16 am ] |
| Post subject: | Re: New track at Strasburg? |
What's the cost to lay track these days? Figure a passing spur on a main line, big enough to accomodate an engine, tender, and 3-4 coaches? |
|
| Author: | daylight4449 [ Thu May 05, 2011 7:03 am ] |
| Post subject: | Re: New track at Strasburg? |
6-18003 wrote: What's the cost to lay track these days? Figure a passing spur on a main line, big enough to accomodate an engine, tender, and 3-4 coaches? I think that Strasburg trains run in the area of 7-8 coaches. Might want to double that length, and accomidate for a tender. So about 10 coaches in length. |
|
| Author: | S. Weaver [ Thu May 05, 2011 10:13 am ] |
| Post subject: | Re: New track at Strasburg? |
Good ballpark is $165/foot for new sidings. Your mileage may vary ... |
|
| Author: | daylight4449 [ Thu May 05, 2011 11:01 am ] |
| Post subject: | Re: New track at Strasburg? |
S. Weaver wrote: Good ballpark is $165/foot for new sidings. Your mileage may vary ... So, if i'm doing my math right, that's $1,650 for every ten feet. Man, the depot is going to need to raise some money for a display track... |
|
| Author: | Bobharbison [ Thu May 05, 2011 11:33 am ] |
| Post subject: | Re: New track at Strasburg? |
S. Weaver wrote: Good ballpark is $165/foot for new sidings. Your mileage may vary ... Keep in mind, that's on a "prepared subgrade", i.e. you have a piece of ground that's to grade and able to support the track. If you need any earthwork, that's in addition to the $165 per foot. On the other hand, if it's simply a display track, you may be able use second hand (relay) materials, and cut that $165 cost significatly in some cases. |
|
| Author: | Mr. Ed [ Thu May 05, 2011 12:41 pm ] |
| Post subject: | Re: New track at Strasburg? |
Thanks S! Later! Mr. Ed |
|
| Author: | cjvrr [ Thu May 05, 2011 1:54 pm ] |
| Post subject: | Re: New track at Strasburg? |
I just had 21,000+ feet of County owned track rebuilt for $115 per foot. New sidings were $130.00 per foot including excavation. This was in northern NJ. Used No.1 relay 136 lb rail. New #10 turnouts ran $55,000.00 each, 10 total on the job. Surfacing and aligning track cost another $5.00 per foot and ballast was $20.00 per ton, installed. Excavation was $30.00 per cubic yard. |
|
| Page 1 of 2 | All times are UTC - 5 hours [ DST ] |