It is currently Thu Mar 28, 2024 3:07 pm

All times are UTC - 5 hours [ DST ]




Post new topic Reply to topic  [ 16 posts ]  Go to page Previous  1, 2
Author Message
 Post subject: Re: streetcars and ice on the trolley wire
PostPosted: Fri Jan 19, 2018 12:40 am 

Joined: Mon Sep 06, 2010 10:51 pm
Posts: 104
At the Halton County, we generally stop public operations after the second week in December but may do some switching over the winter depending on conditions. We will be attempting to keep our line plowed this year to accommodate a Winterfest operation in February. So far, our snow sweeper has been up to the task. Icing up of our embedded track can be a headache as can drifting of snow in areas adjacent to buildings. We have both ice and sleet cutters if needed. In the 46 years I have been there, we have only needed them a couple of times.

Generally, the carbon insert used in the regular J-6 shoe
provides some lubrication on the contact wire. All our cars in general use have sliders, not wheels. Our London & Port Stanley, heavyweight combine, #8 uses pantographs with replaceable copper strips on the pan shoes. When the car comes in for routine inspection after roughly 6 to 8 operating days, a thin layer of graphite grease is brushed on to the pan contact surfaces. This has all but eliminated wear.


Offline
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 16 posts ]  Go to page Previous  1, 2

All times are UTC - 5 hours [ DST ]


 Who is online

Users browsing this forum: Bobulltech, Google [Bot], SD70dude and 116 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to: