PostPosted: Mon Mar 03, 2014 2:07 am 

Joined: Sat Jan 02, 2010 1:16 pm
Posts: 66
Location: Bellefontaine, Ohio
Work has continued on steam engine #3, the 060 Baldwin. As you look on the Face Book Site you will see the cab is on. The floor to the cab should be installed. Saturday was a work day. The crews are getting a lot for work done on various projects.